January 2006
The first work team - loading the sandblaster to begin sandblasting the prayer chapel.
Sandblasting the prayer chapel.
Pointing the stone in the prayer chapel
fixing the plaster in the stairwell, to prepare for painting.
Painting the hallway/stairwell
Pointing the stonework in the prayer chapel
The church in Tournus
The chateau at Berze, near Macon
Another view of the Berze chateau
putting up studs and drywall in the prayer chapel
Ben putting up drywall in the prayer chapel
Installing the drop ceiling in the prayer chapel
stripping wallpaper in the Grande Salle
the grande salle
the grande salle again, Debbie pulling off the old paper
Steaming the wallpaper off in the new meeting room
Painting the ceiling in the grande salle
painting the ceiling in the grande salle
Debbie and Paula painting the grande salle ceiling
Ben texturing the walls in the new meeting room
Jay painting some beams in the grande salle
half of the completed prayer chapel ceiling
JAlbum 5.2